Year2018

Leskovice, design of a reconstruction of a railway bridge

Single-track railway bridge has a superstructure of a span length of 15,5 m, made of precast post-tensioned girders KT-18z. For its repair and strengthening, a cast-in-situ composite UHPFRC over-lay was designed.
Design 2018, so far not built.
The design was elaborated during previous employment (Faculty of Civil Engineering of the Czech Technical University in Prague).

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.