Year2002

Březno u Chomutova, railway viaduct (valley bridge)

Single-track railway bridge of 8 spans of 20,0 to 26,0 m. Superstructure of the bridge is continuous cast-in-situ single-beam, made of post-tensioned concrete.
Responsible designer and structural analysis.
Conceptual to final design 1997 – 1998, construction 2000 – 2002. The design was elaborated during previous employment (Sudop Praha J.S.C.).