Year1997

Žabčice, bridge over a railway line

Road bridge of two spans of 2 x 18,0 m, over a railway line. Superstructure of the bridge is continuous composite concrete – concrete, made of precast pre-tensioned girders DS-PP with a composite cast-in-situ reinforced concrete deck slab and with cast-in-situ RC cross beams.
Conceptual to final design 1996, construction 1997. The design was elaborated during previous employment (Sudop Praha J.S.C.).